Stage 3 Separation

Performance Solids Control

Stage 3 leads the way in Performance Solids Control.

Our methods are used to prepare drilling fluids for oil and gas rigsĀ during the drilling cycle. Utilizing Stage 3’s Performance Solids Control can effectively reduce the costs of drilling fluid maintenance, clean up and disposal fees, as well as the overall cost.

Learn more about our additional service offerings: reporting services, rig engineering, and technical services.